Wiring, Termination and Fiber Optic Work
Cable pulling, core-alignment fusion splicing, control cable termination, and communication network continuity verification for power generation facilities.
Proven track record of high-standard, on-time industrial engineering projects with uncompromising workplace safety (HSE) standards across various manufacturing and energy facilities in Indonesia.
Cable pulling, core-alignment fusion splicing, control cable termination, and communication network continuity verification for power generation facilities.
Medium Voltage (MV) 20kV power cable termination on transformer/switchgear units and High-Potential (Hi-Pot) insulation testing to ensure electrical system reliability.
Underground medium voltage cable jointing and power conductor termination at electrical distribution substations.
Fabrication and installation of Cool Storage 1 cold room, refrigeration compressor-condenser units, refrigerant piping, and precision temperature controls.
Precision installation of pneumatic control valves, smart pressure transmitters, fire alarm detection systems, emergency PAGA sound systems, and instrument calibration.
Comprehensive overhaul and reconditioning of chemical plant industrial valves (control, gate, globe, and safety relief valves) with strict pressure leak testing.
Rigging, positioning, and installation of MV/LV switchgear cubicles, heavy cable pulling along tray routes, and safety-certified scaffolding erection.
Periodic maintenance of industrial electrical systems and distribution panels, busbar torque tightening, cubicle servicing, and electrical parameter measurements.
Installation of cable trays, high-elevation conduit piping, grounding rod installation, and verified earth resistance testing achieving 0.22 Ohms.
Installation of Daikin packaged HVAC units, industrial chiller & pump piping, air distribution ducting, and clean cool room setup for precision manufacturing climate control.
Installation of eco-friendly 301.60 kWp Rooftop Solar PV system on commercial facility roofs, mounting rail assembly, and grid inverter integration.
Refilling and maintenance service for Dry Chemical Powder and CO2 Fire Extinguishers (APAR) meeting industrial petrochemical safety and OHS compliance standards.
No projects matching your search query.